Jira Sprint Status Digest

Posts the standup instead of holding it: yesterday's closes, today's work in progress, each blocked ticket with its hold quoted from the issue, plus every item that arrived in the sprint or vanished from it overnight.

0 in use25
Loading preview…
Guided setup — test it before connecting anything.

Watch it work before it's live

Run a staged conversation — no account needed. The agent handles it for real while a simulated world answers its tool calls; nothing touches real accounts, and nothing is actually sent.

Sprint digest 12 May

Payments BoardPAY

Day 6 of a 10 day sprint with 34 issues in scope. Four reached Done since yesterday, nine sit In Progress and three are In Review. PAY-1841 has carried the blocked flag for four days with the impediment note waiting on acquirer sandbox credentials from Nordea. Two issues were pulled in yesterday by the product manager and one was pushed to the next sprint.

Set up in minutes

Using this template drops you into a guided setup. It asks exactly this, nothing else:

  1. Connect Jira

    One sign-in. The agent acts through your account, scoped to what this template uses.

  2. Connect Slack

    One sign-in. The agent acts through your account, scoped to what this template uses.

  3. Sprint scope

    Which board and project this covers, the JQL that finds your active sprint, and who to name when a query comes back broken.

  4. Digest style

    How your standup should read: how many lines before people stop scrolling, whether the assignee belongs on every line, and which headings your team genuinely uses.

  5. Choose which agent runs it

    NoClick's built-in models work out of the box — or bring Claude Code, Codex, and other coding agents on your own subscription.

  6. Watch it handle a test run

    A staged conversation against a simulated world — then it’s live.

About this agent

Standup is twelve people taking turns to read out a board that everybody could have read. Each morning this agent runs your sprint JQL and posts one Slack message: yesterday's closes, the work in flight, every blocked issue with the reason quoted from the ticket itself, and whatever entered or left the sprint since it opened. Teams spread across time zones get the same picture without needing to be awake at the same moment as each other.

What people use it for

  • Standup becomes something you read - The circle exists because nobody has looked at the board. Once the board turns up in Slack at nine, the meeting either shrinks or quietly stops, and the people in the wrong time zone stop missing it entirely.
  • Blockers arrive with their reason - Each blocked line quotes the impediment text and how long it has sat there, so a four day wait on an outside vendor reads as four days rather than as a red icon nobody has clicked.
  • Mid sprint additions stop hiding - Work that turned up after the sprint opened is listed by key, so at the end of the week nobody has to argue about whether scope changed, only about what to do next time.
  • A written record for retro - Each morning's message stays in the channel, so at retro you scroll back to the day a blocker first appeared rather than reconstructing the fortnight from memory.

Before you fork

We already have a board and sprint reports. Why a digest?

Both wait for somebody to open them, and neither one quotes the blocker text out loud. This lands where your team is already typing, with the flag reasons and the late arrivals spelled out. If your board honestly does get read by everyone before standup, you do not need this.

Can it change anything on the board?

No. Its Jira access is a search and a read, and it is instructed never to transition an issue, post a comment, or edit the sprint. The Slack message is the entire output, so the worst outcome is a wrong line in a channel rather than a wrong state on a board twelve people are working from.

What does it need from Jira, and what does a month of mornings cost?

A Jira credential that can browse the project and run JQL, plus a Slack channel to post into. It runs once each morning whether the sprint holds nine issues or ninety, so spend follows the schedule rather than the board. The schedule step sets the time and the time zone, which lets it land twenty minutes ahead of standup wherever your team sits.

Run it with your coding agent

Works with

More agents like this

Browse all agent templates →

Put Jira Sprint Status Digest to work

Free to start. Guided setup, a test run against staged conversations, and it's live.